If any of the 15 measures need to be carried out in connection with a construction work, a written work environment plan must be established. Or if the work is of such scope that it requires a prior notification. This means that if the work lasts longer than 30 working days, employs more than 20 people simultaneously, or the total number of person-days exceeds 500. NƤr ska det finnas en arbetsmiljƶplan? Ifall nƄgon av dessa 15 ƄtgƤrder behƶver utfƶras i samband med ett byggnads- eller anlƤggningsarbete sƄ krƤver det att en skriftlig arbetsmiljƶplan upprƤttas. Eller ifall arbetet Ƥr av sƄdan omfattning att det krƤver en fƶrhandsanmƤlan. Det vill sƤga om arbetet pƄgƄr lƤngre Ƥn 30 arbetsdagar, sysselsƤtter fler Ƥn 20 personer samtidigt eller det totala antalet persondagar blir fler Ƥn 500.